The proposal seeks to redevelop the existing Riverwood Hotel site into an 8-storey shop top housing development comprising 192 apartments, including 5% affordable housing dedicated for 15 years, with ground floor commercial uses including the reinstated Riverwood Hotel pub, three basement parking levels, and landscaping. A concurrent Planning Proposal supports the rezoning of the land from R3 Medium Density Residential to R4 High Density Residential with an additional permitted use, an increase in the existing height of buildings control from 8.5m to 31m, and an increase in the floor space ratio control from 0.5:1 to 3:1 under the Canterbury-Bankstown Local Environmental Plan 2023. These amendments will allow the site to maximise its redevelopment potential and transform a significantly under-utilised site. Patch have successfully assisted the client in navigating the newly established HDA pathway, supporting the project through its early design development through to lodgement. Our team has led the coordination of multidisciplinary technical inputs, engaged closely with government agencies and stakeholders, and prepared the combined Environmental Impact Statement and Planning Proposal documentation.
back to projects